Update on the Dallas visit
There were a couple of major accomplishments with today's visit to Dallas.
1. Stage Height - We've been wrestling with this for over 3 months. And we had previously been able to lower the stage height from 36 inches to 28 inches. We had to wait for a "sight line" study before we could do anything else and the speaker design for the audio system had to be worked out. (There will be some speakers built into the stage and there has to be enough height to allow for these speakers.) After reviewing the sight lines we were able to lower the stage height to 21 inches. This is great news! The lower the height the more connected the audience will feel to what is happening on stage.
2. Video Display System - This is what prompted today's visit. There had been some changes that deviated from the original vision of what we ultimately want to end up with. So most of the design here will be limited to just getting the infrastructure in place so at a later date we will be able to add a VIDEO WALL behind the band. There are too many uses for this to list here but I am really looking forward to what this will add to the worship experience.
3. House and Stage lighting - This is now our holdup before we can complete our Construction Documents. The Lighting Engineer, the Electrical Engineer and the HVAC Engineer have to re-spec the plans. When the lighting plan changes it affects the electrical needs as well as the air conditioning needs.
I didn't get a specific date for completing the construction documents but I anticipate they will be done this month. Then the hard bids will begin and after that we will work with a contractor to make some adjustments to reduce the cost of the project without compromising our needs. When the value engineering is complete and permits are in place then we will see the construction begin!
The one thing I know about this project... we need the space ASAP!
Tuesday, February 2, 2010
Monday, February 1, 2010
Day trip to Dallas
In the morning I am flying to Dallas for a meeting with our architect as well as our Audio/Video/Lighting (AVL) engineer. The purpose of the meeting is to settle on the AVL plan for the stage in the worship center.
I'll provide an update after the visit.
I'll provide an update after the visit.
Subscribe to:
Posts (Atom)